📘 reference — overview/guide, not tied to a code symbol
Validation by Beadloom
doc_sync— same source assync-check.
isdayoff.ru ​
The isdayoff.ru production calendar, a public service that answers whether a date is a working day by the Russian production calendar. An external system: this repository holds no code of it and declares only the surface the service reads.
Source ​
None in this repository. The node's source in .beadloom/_graph/landscape.yml is this file, so the graph has no sourceless node.
Specification ​
Purpose ​
Holidays fall on weekdays and some Saturdays are working, so the Monday-Friday rule alone would check in on a holiday. isdayoff.ru gives the verdict for one date. When it gives no clean answer, the domain falls back to the Monday-Friday rule and the report says so.
Contracts ​
http:isdayoff-day — isdayoff → isdayoff-calendar ​
Declared from both ends in landscape.yml. The portal's map shows it as a dependency with a presence verdict, and the surface below is the one isdayoff-calendar reads.
- Request.
GET https://isdayoff.ru/YYYYMMDD(for example/20261026), no authentication, no query, a 5-second timeout. At most one request per run. The run loop asks the calendar once, and a--forcerun asks it nothing. The dry run (checkin|checkout --dry-run, throughWindowedRun.first_decision) also asks it once, and the probe asks it once for today. - Answer. Status 200 with a one-character body:
| Body | Meaning | The adapter's answer |
|---|---|---|
0 | working day | True |
1 | non-working day | False |
2 | shortened pre-holiday day, still working | True |
- Everything else is no answer. A network error, the timeout, a status other than 200 or any other body is
None, logged as a warning that names the date, and never raised. OnNonethe report's calendar line reads "unreachable, the Mon-Fri rule decided", and the probe's calendar check isdegraded, notfailed.
Invariants ​
- The calendar is a source of verdicts, never of failures: no answer of it fails a run.
- Tests never reach isdayoff.ru: the adapter is tested on
httpx.MockTransport, and the acceptance scenarios run on a fake calendar.
Dependencies ​
Declared in .beadloom/_graph/landscape.yml as contract edges, not derived from imports: an external system has no code here.
- Produces:
http:isdayoff-dayforisdayoff-calendar - Consumes: (none)
Parent ​
None: an external system, not part of horizon-tracker. The consumer is isdayoff-calendar.